For businesses moving premises
Office shifting, planned around downtime
An office move is a scheduling problem before it is a transport problem. We plan the sequence by department so files and equipment arrive where they are needed, not in one pile.
- Out-of-hours and weekend loading
- Department-wise labelling
- Workstations dismantled and rebuilt
- IT equipment boxed separately
Planning
The sequence we agree before the date
-
01
Walk the floor
We look at what is being moved, what is being left behind, and how the new floor is laid out. That decides the load order more than the number of desks does.
-
02
Label by department
Every box and workstation gets a department and a destination position. Unloading then happens zone by zone instead of room by room.
-
03
Separate the sensitive items
Laptops, monitors and servers are boxed and numbered separately from furniture. Documents are boxed by cabinet and kept upright where required.
-
04
Load after hours
Most office moves load on a Friday evening or over a weekend so the building lift and parking are free and the team is not working around the move.
-
05
Rebuild and hand over
Workstations are reassembled in the agreed layout, boxes are placed at their labelled positions, and anything that could not be rebuilt is flagged on the spot.
IT and documents
The two things that stop work resuming
Furniture arriving late is inconvenient. Laptops and files arriving to the wrong floor is a lost working day. They are packed and tracked separately for that reason.
Equipment is boxed with its cables bagged and labelled with the asset or user name. Cabinets are moved with drawers secured and contents ordered, so a filing system is not rebuilt from scratch on Monday morning.
- Each laptop and monitor boxed and numbered against a list
- Cables and accessories bagged with the device they belong to
- Filing cabinets moved with contents retained where the locks allow
- Server and network equipment handled only in the order your IT contact specifies
Network, server and telephone systems may need your IT provider on site. We move the equipment; we do not reconfigure systems.
Scope
Typical office move split
| Item | Position |
|---|---|
| Desks, chairs, storage and loose furniture | Included in the quoted scope |
| Dismantling and reassembly of standard workstations | Included when listed in the quote |
| Packing of loose items and files | Included when packing is quoted |
| IT and network equipment | Moved as boxed equipment; reconnection is by your IT provider |
| Specialist items such as servers or lab equipment | Separate scope, agreed in writing |
| Building lift, loading bay and after-hours permissions | Arranged by the client with the building management |
Confirm lift access, loading bay booking and after-hours permission with both buildings before the move date. These are the most common cause of delay.
Before the move
What the client usually handles
- Nominate one person on each floor who can answer questions during the move.
- Get written approval from both buildings for the lift, loading bay and timing.
- Back up and shut down IT equipment; keep servers with your IT provider until transport is agreed.
- Clear personal items and anything confidential that should not leave the office in a carton.
- Share the new floor layout so workstations can be placed correctly at the other end.
Questions
Office relocation questions
Can you move an office overnight?
Overnight and weekend loading is common for offices. The realistic limit is how much can be packed in advance; a large floor usually needs more than one evening.
Do you move servers and network equipment?
Equipment can be moved as boxed cargo with the handling instructions your IT contact gives. Shutdown, transport protection and reconfiguration should be coordinated with your IT provider.
How is an office move priced?
Mainly by volume, the amount of dismantling and reassembly, packing required, access at both buildings, and whether the job runs after hours. A floor plan and a count of workstations narrows it quickly.
Can we move in phases?
Yes, and for larger offices it is usually the better plan. Moving a department at a time keeps the business running and makes unloading much easier to check.
Office move
Send the floor and the date
Number of workstations, both addresses and the timing window you can allow — that is enough to start.
Prefer to write the number down? +91 80551 82811